• About Us
  • Advertise
  • Contact Us
  • Privacy Policy
  • Pickem Terms and Conditions
Tuesday, August 18, 2026
The Platte County Landmark Newspaper
  • Home
  • Local News
  • Opinion
  • Landmark Pickem!
    • Weekly Pickem Updates
    • Results by Week
    • The Leaderboard
    • Pickem Rules and Help
  • Landmark Live!
  • Looking Backward
  • Home
  • Local News
  • Opinion
  • Landmark Pickem!
    • Weekly Pickem Updates
    • Results by Week
    • The Leaderboard
    • Pickem Rules and Help
  • Landmark Live!
  • Looking Backward
No Result
View All Result
The Platte County Landmark Newspaper
No Result
View All Result

Innovative travel experience pledged at the New KCI

Landmark Staff by Landmark Staff
December 10, 2021
in Featured
New KCI
17
SHARES
434
VIEWS
Share on FacebookShare on TwitterShare via Email

Henderson Engineers, a national building systems design firm, says it is leading the charge on cementing the new single terminal Kansas City International Airport (MCI) as a world-class facility.

The new airport is scheduled to open early in 2023.

RelatedNews

Microchip scanner can reunite pets with owners

Group says get the Flock out of here

Wright, Palmer engage in spicy battle for recorder

As the lead engineer on the $1.5 billion project, the firm is working closely with project partner Siemens to equip MCI with innovative technology for a cutting-edge experience for both travelers and the facility’s operations team.

“We’re excited to be delivering a cutting-edge terminal within our hometown region,” said James Dietz, aviation practice director at Henderson Engineers. “A key advantage we bring to the table at MCI is more than 50 years of expertise in design and construction. We help merge wonderful ideas from various project partners and make sure they’re constructable and that they work together both aesthetically and functionally.”

Henderson designed the technological infrastructure that enables key features including touchless kiosks, intuitive display systems and video walls, and visual paging boards for passengers who are deaf or hard of hearing – all intended to make it easier and accessible to navigate through the building. This infrastructure will also support a biometric verification system that will enable travelers to use their faces as boarding passes during check in and boarding for international flights. Henderson is helping with planning and coordinating the installation of biometric equipment to ensure it works smoothly with other technological systems throughout the airport.

Safety is also a key touchpoint. To minimize blind spots at the expansive 1,000,000 square foot terminal, Henderson used 3D BIM software to determine the best placement for security cameras. Using a virtual replica of the facility, engineers were able to evaluate what cameras would capture at various terminal locations and make expert recommendations accordingly.

Furthermore, Henderson is collaborating with the Transportation Security Administration (TSA) and United States Customs and Border Protection (CBP) throughout the selection and installation process for security systems to ensure the terminal is equipped with state-of-the-art safety technology.

“Convenience, well-being, and safety are front and center of the work we’re undertaking, and we believe it will resonate well with the passengers and airport staff once the terminal opens in early 2023,” explained Dietz.

Upon the project’s completion, MCI will be confronted with smoothly transitioning away from its current outdated three-terminal layout to the new single terminal. Since airport operations will need to remain functional during the transition, Henderson collaborated with project partner SITA to design a virtualized IT network that will prevent interruptions to security and other vital systems during the changeover.

Overall, Henderson says it worked closely with the operations group at MCI to ensure the project would be state of the art at opening and have capacity for future growth, technological advancements, and everchanging travel regulations.

“Virtually every design that is going into this project has an eye toward the future,” said Dietz. “We’re making sure it’s innovative now but can easily be updated as technology evolves and in case the requirements surrounding airline travel are updated. This flexibility will help keep MCI at the forefront of travel for decades to come.”

In addition to technology, Henderson’s array of building systems design services for the new single terminal MCI includes acoustics, audio-video, electrical, fire alarm, mechanical, and plumbing.

Skidmore Owings & Merrill (SOM) is the lead architect and Edgemoor Infrastructure & Real Estate is the developer.

Landmark Staff

Landmark Staff

Related Posts

45 Years Ago–Aug. 14, 1981

by Ivan Foley
August 15, 2026
0

Mrs. Deon Johnson and Rev. Donovan Johnson of Dearborn have announced the engagement of their daughter, Valerie Dawn Johnson of St. Joseph, to Ronald A. Engelken, D.V.M., of DeKalb, Mo., son of Mrs. Pat Engelken and Ben Engelken of Goff,...

30 Years Ago–Aug. 15, 1996

by Ivan Foley
August 15, 2026
0

Ward B. Stuckey, circuit judge of Platte County, has sentenced Michael Koenig, 30, to 30 years in the Missouri Department of Corrections for a series of car break-ins at the KCI Airport. A jury found Koenig guilty on July 9...

15 Years Ago–Aug. 17, 2011

by Ivan Foley
August 15, 2026
0

Hannah Rickman, this year’s Platte County Fair Queen, finished fourth in the competition for Missouri State Fair Queen at the State Fair in Sedalia last week. Former Platte County assistant prosecutor Rob Willard has announced his candidacy for treasurer of...

Red Friday herring

by Chris Kamler
August 15, 2026
0

(Note: I have a side job working for 65-Toss Power Trap, a subsidiary of the Kansas City Chiefs. This column reflects my personal opinions and does not, in any way, reflect the opinions or views of the Kansas City Chiefs...

Next Post
Platte City won’t waive connection fees for R-3

Platte City won't waive connection fees for R-3

Popular News

  • Letter to the Editor

    Behind the scenes in treasurer’s race

    17 shares
    Share 7 Tweet 4
  • Republicans may be clearing a Lahn, 80s music, Flock talk

    12 shares
    Share 5 Tweet 3
  • Maki, Wright, Calvillo talk about victories

    8 shares
    Share 3 Tweet 2
  • Group says get the Flock out of here

    35 shares
    Share 14 Tweet 9
  • Water slide, live music, pyro show set

    7 shares
    Share 3 Tweet 2
  • About Us
  • Advertise
  • Contact Us
  • Privacy Policy
  • Pickem Terms and Conditions
Call us at 816-858-0363

Copyright © 2019-2020 The Platte County Landmark Newspaper - All Rights Reserved

No Result
View All Result
  • Subscribe Online
  • Home
  • Local News
  • Opinion
  • Landmark Pickem
    • Results by Week
    • The Leaderboard
    • Pickem Rules and Help
  • Landmark Live!
  • Looking Backward

Copyright © 2019-2020 The Platte County Landmark Newspaper - All Rights Reserved