• About Us
  • Advertise With Us
  • Contact Us
Friday, October 23, 2026
The Platte County Landmark Newspaper
  • Home
  • Local News
  • Opinion
  • Home
  • Local News
  • Opinion
No Result
View All Result
The Platte County Landmark Newspaper
No Result
View All Result

New traffic pattern for US 169 to begin in the spring

Landmark Digital by Landmark Digital
January 16, 2026
in Headlines
US 169
32
SHARES
792
VIEWS
Share on FacebookShare via Email

SINGLE LANE TRAFFIC TO RUN BOTH DIRECTIONS

In the spring, the Missouri Department of Transportation will reopen NB U.S. 169 just north of the Kansas City Downtown Airport -Wheeler Field in a new traffic pattern.

RelatedNews

Judge plans preliminary order in tax credit lawsuit

Dog park nears opening amid debate

Parkville business owners, city officials offer contrasting views on downtown renovations

As part of the new traffic pattern, crossovers will be constructed, and northbound/southbound U.S. 169 traffic will be reduced to one lane in each direction and placed in a head-to-head traffic pattern across the SB U.S. 169 Viaduct Bridge.

This will allow northbound U.S. 169 to open to traffic across the southbound U.S. 169 Viaduct Bridge.

On Dec. 16, 2025, the northbound U.S. 169 Viaduct Bridge was closed for further evaluation. After further evaluation, MoDOT determined it was necessary to keep the bridge closed.

This bridge was already scheduled for replacement in summer 2026 after the World Cup.

The new traffic pattern on NB/SB U.S. 169 will begin just past the Kansas City Downtown Airport – Wheeler Field and end just north of the viaduct bridges near Briarcliff Parkway and MO Route 9.

The speed limit will be reduced from 55 mph to 45 mph throughout the project area.

The new traffic pattern will open over the SB U.S. 169 Viaduct Bridge after the completion of the design and construction of the crossover roadway. An exact timeline for the opening of the new traffic pattern will be shared once finalized in the Spring. This work is weather-dependent.

The following traffic impacts will be in place beginning in Spring 2026

·MO Route 9 traffic will not be able to access SB U.S.169
·NB U.S. 169 traffic will not be able to exit onto MO Route 9.
·Access to the downtown airport will be maintained on NB U.S 169 across the Buck O’Neil Bridge.

In addition, during construction of the crossovers the SB U.S. 169 Viaduct Bridge may be closed for 2-3 days for the installation of new traffic control devices on the SB U.S. 169 Viaduct Bridge. Short-term traffic impacts are also expected during the construction of the crossovers.

Motorists traveling on NB U.S. 169 are encouraged to utilize MO 9 and Interstate 29/35 to navigate around the closure. The nearby river crossings of Fairfax, Chouteau, Heart of America Bridge, Kit Bond Bridge and the I-435 River Bridge are also recommended for motorists to use to navigate around the project area.

Landmark Digital

Landmark Digital

Related Posts

Wake up Platte County

by Landmark Digital
October 22, 2026
0

Editor: Are we asleep at the wheel? Every day I meet new people who are genuinely concerned about Platte County’s increase in taxes and cost of living, failing public schools, skyrocketing crime rates and a lack of effective leadership. I...

Thank you, Platte County

by Landmark Digital
October 22, 2026
0

Editor: Over the past 10 months, I have knocked on doors in nearly every corner of Platte County and I want to say thank you. Thank you to the neighbors who opened their doors, offered a glass of water and...

Platte County could use a bookkeeper

by Landmark Digital
October 22, 2026
0

Editor: Most of Platte County has never heard of me, so let me introduce myself the way my opponent did at a recent candidate forum. He called me a bookkeeper. He meant it as a put-down. I will take it...

Supporting veterans beyond Veterans Day

by Landmark Digital
October 22, 2026
0

Editor: On behalf of the members of American Legion Post 318 in Parkville, I want to express our sincere gratitude to Jason Maki and his wife Leah for their incredibly generous support of our post and our veterans. Jason and...

Next Post
Donald Trump

Chiefs fixer, Trump weekends

Popular News

  • Platte County Board of Elections

    A guide to early voting in Platte County

    75 shares
    Share 30 Tweet 19
  • Judge plans preliminary order in tax credit lawsuit

    31 shares
    Share 12 Tweet 8
  • Dog park nears opening amid debate

    18 shares
    Share 7 Tweet 5
  • Clerk candidates share goal, differ on approach

    10 shares
    Share 4 Tweet 3
  • Platte County Democrats invite community to meet the candidates

    9 shares
    Share 4 Tweet 2
  • About Us
  • Advertise With Us
  • Contact Us
Call us at 816-858-0363

Copyright © 2019-2026 The Platte County Landmark Newspaper - All Rights Reserved

No Result
View All Result
  • Subscribe Online
  • Home
  • Local News

Copyright © 2019-2026 The Platte County Landmark Newspaper - All Rights Reserved